Home
Services
Equipment
Previous Jobs
Contact
Previous Jobs
A runway that we built to bring 8,000 lb ups units across a roof.
Full load of fiber processing equipment
New tunnel wash system
28,000 lb stamping press
The Elgin gate
One of Hitler's cars going to the new war museum
New Trane chiller being reassembled at the University of Ottawa
60,000 lb Printing press being hoisted by our 80,000 lb Rigger lift truck and 50 ton boom
Flight Simulator being raised at Ottawa Airport
The Apollo 7 that was in the museum of science and technology leaving to go back to Texas.